WCPI search results

[new search]

4 results (sorted by title)

Display as: brief entries full entries data grid

add to order image no. contact sheet collection creator title description subject(s) date
66197 A2140 Parrish and Heimbecker Limited Collection     The Camp Erected Near The Cpr North Transcona Grain Elevator During The Righting And Underpinning Operations After The Elevator Experienced A Soil Bearing Capacity Failure During Its First Loading  AgricultureTransportationElevatorsAccidentsConstruction 1914, January 6
66195 A2140 Parrish and Heimbecker Limited Collection     View From The North East Of The Cpr North Transcona Grain Elevator After It Experienced A Soil Bearing Capacity Failure During Its First Loading  AgricultureTransportationElevatorsAccidents 1914, January 6
66196 A2140 Parrish and Heimbecker Limited Collection     View From The Southwest Of The Cpr North Transcona Grain Elevator After It Experienced A Soil Bearing Capacity Failure During Its First Loading  AgricultureTransportationElevatorsAccidents 1914, January 6
66193 A2140 Parrish and Heimbecker Limited Collection     View Of The West Side Of The Cpr North Transcona Grain Elevator After It Experienced A Soil Bearing-Capacity Failure During It First Loading. Construction On The Structure, Which Consisted Of 65 Bins With A Total Capacity Of One Million Bushels, Commenced In 1911 And Was Completed In September 1913. The Foundation Consisted Of A Large Rectangular Raft, 77 Feet By 195 Feet, Resting On A Plastic Clay Deposit 12 Feet Below Grade. On October 18,1913, After 875,000 Bushels Of Wheat Had Been Loaded Into The Elevator, Settlement Was Noted. For 24 Hours The Elevator Continued To Tilt Toward The West, Coming To Rest At An Inclination Of Over 26 Degrees From Vertical . The Elevator Was Subsequently Righted And Underpinned To Bedrock.  AgricultureTransportationElevatorsAccidentsRafts 1914, January 6